Location: Zillmere | Year: 2024-current
We have completed numerous projects for a local developer. For this project they have divided the block into two and utilised the existing home on lot 1 and sourced a second home post era for lot 2.
Works Completed:
- Property pole and power supply upgrade for lot 1 and 2
- Switchboard Upgrade and installation
- Mains power supply
- Lighting, data and power installation